欧美黑人xxxx猛性大交 I 久久爱www久久做 I 日韩1区2区3区 I 又色又爽网站 I hs网站在线观看 I 麻豆免费在线观看 I 村上丽奈 I 国产精品jizz在线观看麻豆 I 久久人久久 I 欧美激情一区二区三区在线视频观看 I 国产精选自拍 I 欧美中文字幕一区二区 I 国产村民一二三区 I 99久久婷婷国产精品综合 I 国产精品欧美在线 I 国产婷婷色综合av蜜臀av I 精品自在线 I 亚洲中字在线 I 成人韩免费网站 I 中文字幕韩在线第一页 I 中文字幕精品三区 I 婷婷丁香色综合狠狠色 I 出租屋做爰全过程视频 I 在线日韩av I 一级黄色高清片 I 五月 婷婷 色 I 免费视频一级片 I 久久伊人91精品综合网站 I 福利91在线 I 亚洲欧美日韩国产精品 I 一群女同学蹂躏我jiji I 欧美 日韩 久久 I 3p三男一女吃奶刺激视频 I 日产亚洲一区二区三区 I 亚洲免费国产视频

POSITION:HOME > QUESTION

QUESTION

Brazed plate heat exchanger process requirements

1) pickling temperature: increasing the pickling temperature is conducive to improve the descaling effect, if the temperature is too high, it will aggravate the corrosion of the acid washing plate on the heat exchanger plate, through repeated tests, acid The washing temperature is preferably controlled at 60 °C.
2) pickling solution concentration: According to repeated trials, the acid washing solution should be prepared according to the concentration of formic acid 81.0%, water 17.0%, buffer 1.2%, surfactant 0.8%, cleaning effect it is good.
3) pickling method and time: pickling method should be combined with static soaking and dynamic cycling. The pickling time is first static soaking for 2 h, then dynamic cycling for 3-4 h. The pickling concentration should be sampled frequently during the pickling process. When the difference between the two adjacent assays is less than 0.2%, the pickling reaction is considered to be complete.
4) passivation treatment: after the end of pickling, the scale and metal oxide on the surface of the plate heat exchanger are mostly dissolved and detached, exposed to new metal, easy to corrode, so pickled After that, the heat exchanger sheets are passivated.
2019/05/11 09:27:26 5343 Click